|
|
||||||||||||||||||
|
|
||||||||||||||||||
|
|
||||||||||||||||||
Loddon Bridge Road, Woodley28 May â 29 May |
||
|
Delays likely – Traffic control (multi-way signals) |
||
|
Works location: Outside 221 |
||
|
Works description: Locate and excavate 1 blockage in existing duct |
||
|
Responsibility for works: Openreach |
|
|
||||||||||||||||||
|
|
||||||||||||||||||
|
|
||||||||||||||||||
|
|
||||||||||||||||||
Loddon Bridge Road, Woodley28 May â 29 May |
||
|
Delays likely – Traffic control (multi-way signals) |
||
|
Works location: Outside 221 |
||
|
Works description: Locate and excavate 1 blockage in existing duct |
||
|
Responsibility for works: Openreach |
|
|
||||||||||||||||||
ÂĐ Woodley Town Council 2025